Index > Watten Wind Farm

Watten Wind Farm

Name
Watten Wind Farm
Ward
Wick And East Caithness
Site
Land 3670M SW Of Watten Village Hall Watten
THC Reference
23/04113/S36
ECU Reference
 ECU00004509
Applicant
EDF Energy Renewables Ltd
Proposal
Watten Wind Farm - Erection and operation of a wind farm for a period of 35 years, comprising of 7 wind turbines with a maximum blade tip height of 220m, access tracks, borrow pits, substation, control building, battery storage and ancillary infrastructure. This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004509.
Deadline
03/11/2023
Status
Under Consideration
Total capacity
67.6 MW
Capacity turbines
47.6 MW
Number of turbines
7.0
Height turbines
220.0 m
Capacity BESS
20.0 MW
Area BESS
1350.0 m2
Comment
This is the wrong development in the wrong area: too close to a major settlement, very close to individual houses, bordering on the Unesco flow country site, turbines too high and not integrating with existing clusters. As it is often the case with wind farms including a Battery Energy Storage System (BESS for short) there is very little details given for the BESS. Considering the imminent danger of a BESS, the lack of detail is very concerning.
Send objection to
Energy Consents Unit, The Highland Council

All information, plans and images taken from the corresponding application.