Highland
Renewables
Database

Index > Swarclett Wind Farm

Swarclett Wind Farm

Name
Swarclett Wind Farm
Ward
Thurso And North West Caithness
Site
Land 975M SE Of Mains Of Durran Castletown
THC Reference
24/04932/FUL
Applicant
Swarclett Wind Energy Limited
Proposal
Swarclett Wind Farm - Erection and operation of a wind farm for a period of 30 years, comprising 2 turbines with a maximum blade tip height of 149.9m, battery storage and ancillary infrastructure
Deadline
13/03/2025
Status
Under Consideration
Total capacity
21.6 MW
Capacity turbines
9.6 MW
Number of turbines
2.0
Height turbines
149.9 m
Capacity BESS
12.0 MW
Area BESS
460.0 m2
Comment
This is an application for two very tall turbines in an area that doesn't yet have turbines. They will stick out like a sore thumb. They will most likely need lights on top. It is not ok to only determine this issue after consent without public feedback. The public needs to know what to expect. For Camster II infrared lights were promised and then the developer, HIAL and THC agreed on flashing red lights.
Send objection to
The Highland Council

All information, plans and images taken from the corresponding application.