Highland
Renewables
Database

Index > Mey BESS

Mey BESS

Name
Mey BESS
Ward
Wick And East Caithness
Site
Land 700M East Of Woodlands Mey
THC Reference
24/02621/S36
ECU Reference
ECU00004838
Applicant
Mey Energy Storage Limited
Proposal
Installation of a battery energy storage system and and associated infrastructure with a generating capacity of up 300mw located on land at Phillips Mains Farm - This case will be determined by the Energy Consents Unit. Please visit Energy Consents Unit at https://www.energyconsents.scot/ApplicationSearch.aspx?T=2 using reference number ECU00004838
Deadline
23/08/2024
Status
Under Consideration
Total capacity
300.0 MW
Capacity BESS
300.0 MW
Area BESS
96300.0 m2
Comment
This is a very large Battery Energy Storage System (BESS for short). This time for the area of Mey, close to a site that received planning permission for a substation a while back. BESS are very problematic because the safety aspects are not assessed before planning consent is granted. Safety aspects are relevant to site selection and design and should be considered BEFORE an application is granted. All hazards should be declared, assessed and properly mitigated in an application. This has not been done here. The site is close to the North Coast 500 and right next to the National Cycle Route and because of its size and visibility it would have a considerable impact on tourism. In addition, the development will use part of the NC500 for construction traffic.
In addition, this development will use part of the NC500 route for construction traffic.