Index > Lochend Wind Farm Extension

Lochend Wind Farm Extension

Name
Lochend Wind Farm Extension
Ward
Thurso And North West Caithness
Site
Land 600M NE Of 10 Lochend Holding Barrock
THC Reference
24/02641/FUL
Applicant
CWE Lochend Limited
Proposal
Lochend Wind Farm extension - Erection and operation of a Wind Farm for a period of 40 years, comprising of 5 Wind Turbines with a maximum blade tip height 149.9m, Battery Energy Storage System (BESS), access tracks and ancillary infrastructure
Deadline
30/08/2024
Status
Under Consideration
Total capacity
31.0 MW
Capacity turbines
21.0 MW
Number of turbines
5.0
Height turbines
149.9 m
Capacity BESS
10.0 MW
Area BESS
500.0 m2
Comment
This is an extension to an existing wind farm with 4 turbines of 99.5 m height. The 5 new turbines would be one and a half times as big as the existing ones at 149.9 m. Larger turbines need to be placed further apart. The larger turbines are much more imposing and the mix of heights and large distances between the new turbines pulls the cluster apart and makes for a disjoint look. In addition this application proposes yet another Battery Energy Storage System (BESS for short) very close to peat and degraded (and that means dried out) peat. BESS are very problematic because the safety aspects are not assessed before planning consent is granted. Safety aspects are relevant to site selection and design and should be considered BEFORE an application is granted. All hazards should be declared, assessed and properly mitigated in an application.
Send objection to
The Highland Council

All information, plans and images taken from the corresponding application.