Index > BESS at Mybster Croft

BESS at Mybster Croft

Name
BESS at Mybster Croft
Ward
Wick And East Caithness
Site
Land 170M SE Of Mybster Croft Spittal
THC Reference
23/05424/FUL
Applicant
Potencia Energy Limited
Proposal
Erection and operation of a 47MW capacity battery energy storage facility, comprising containerized battery storage units, inverters, transformers, switch room, site access, landscaping, fencing and ancillary infrastructure.
Deadline
22/12/2023
Status
Under Consideration
Total capacity
47.0 MW
Capacity BESS
47.0 MW
Area BESS
2400.0 m2
Comment
This is a Battery Energy Storage System for Spittal next to the A9. BESS are very problematic because the safety aspects are not assessed before planning consent is granted. Safety aspects are relevant to site selection and design and should be considered BEFORE an application is granted. An incident on this site would not only mean obnoxious smoke affecting Spittal and the wider area but also that the A9 has to be closed, potentially for days until the fire has burnt out. The footprint of this application is surprisingly small in comparison to other BESS of a similar size.