Index > BESS at Forss

BESS at Forss

Name
BESS at Forss
Ward
Thurso And North West Caithness
Site
Land 190M West Of Lythmore House South Wing 21 Forss Business And Technology Park Forss Thurso
THC Reference
24/04585/FUL
Applicant
Forss Energy Storage Limited
Proposal
Construction and operation of a Battery Energy Storage System with a capacity of 49.9MW consisting of battery storage modules and associated infrastructure including fencing, control buildings, substations and CCTV
Deadline
13/12/2024
Status
Under Consideration
Total capacity
49.9 MW
Capacity BESS
49.9 MW
Area BESS
5700.0 m2
Comment
This is a Battery Energy Storage System (BESS for short) close to Thurso and right next to the coastline. BESS are very problematic because the safety aspects are not assessed before planning consent is granted. Safety aspects are relevant to site selection and design and should be considered BEFORE an application is granted. An incident on this site would not only mean obnoxious smoke affecting Thurso and the wider area, but also the toxic water run off contaminating the area. To bunding or provision to collect water run off are evident in the plans submitted.