Index > Achlachan Wind Farm 2 Redesign
Achlachan Wind Farm 2 Redesign
- Name
- Achlachan Wind Farm 2 Redesign
- Ward
- Wick And East Caithness
- Site
- Achlachan Windfarm Watten
- THC Reference
- 25/01306/FUL
- Applicant
- Whirlwind Renewables
- Proposal
- Achlachan Wind Farm 2 Redesign - Erection and operation of a wind farm for a period of 40 years, comprising of up to 2 wind turbines with a maximum blade tip height of 149.9m, access tracks, hardstandings and ancillary infrastructure
- Deadline
- 30/05/2025
- Status
- Under Consideration
- Capacity turbines
- 8.52 MW
- Number of turbines
- 2.0
- Height turbines
- 149.9 m
- Comment
- This is an addition to an existing cluster, but these additional turbines are much taller at 149.9m compared to the 115m of Achlachan and 100m of Causeymire. The difference in height will fragment the visual impact further. The turbines are close to houses. Properties to the immediate east of the proposal have been compensated, but others follow on including the village of Spittal, and Dale and Westerdale are close on the west side of the cluster with the new turbines basically sitting on top of Dale House if viewed from the other side of the river. The impact of the existing turbines can already be felt in the properties in the area, adding more turbines and especially such tall ones, will make it even worse. In addition the tall height will mean that aviation lighting is required affecting the dark skies of the area.
- Send objection to
- The Highland Council
All information, plans and images taken from the corresponding application.